|
비점오염저감시설의 강우유출수 처리비 산정식 개선 -WQF 기준 시설- |
최대규, 박무종, 강민지, 김상단 |
|
Improvement of the Empirical Formula for Estimating Stormwater Capture Ratio of WQF Treatment BMPs |
Daegyu Choi, Moojong Park, Minji Kang, Sangdan Kim |
|
|
|
Abstract |
Reduction loads of treatment BMPs can be calculated by using rainfall capture ratio which means the ratio between treated rainfall by BMPs and total annual rainfall in Korean TMDL. In this paper, Rainfall capture ratio and related terms was changed, and it is suggested the improved empirical formula of stormwater capture ratio which can consider the runoff characteristics because treatment BMPs collect not rainfall but stormwater with contaminants. We calculated the real stormwater capture ratio which can be altered by runoff coefficients by using long-term (43years, 1970-2012) rainfall data in seven rainfall stations (Busan, Daegu, Daejeon, Gangreung, Gwangju, Jeju and Seoul), and then, the empirical formula of stormwater capture ratio for WQF treatment BMPs is derived from the real stormwater capture ratio. |
Key Words:
Non-point pollutant source; Stormwater capture curve; TMDL; WQF treatment BMPs |
요지 |
수질오염총량관리에서 비점오염저감시설의 삭감부하량은 연간 총강우량 중 시설에 의해 처리되는 강우량의 비를 의미하는 강우처리비를 이용하여 산정한다. 하지만 비점오염저감시설은 강우가 아닌 강우유출수와 이에 동반되는 오염물질을 처리하는 시설이기 때문에 강우처리비 및 그와 관련된 용어들을 변경하고 강우유출수 연속처리시설에 대해 유출특성을 반영할 수 있는 개선된 강우유출수 처리비 산정식을 제안하였다. 우리나라 7곳의 장기간(1970-2012)의 시간단위 강우자료를 이용하여 유출계수 변화에 따른 실제 강우유출수 처리비 곡선을 산정하였으며, 이에 기반을 두어 우리나라 전역에 사용할 수 있는 강우유출수 연속처리시설의 강우유출수 처리비 산정식을 유도하였다. |
핵심용어:
강우유출수 처리비; 비점오염원; 수질오염총량관리; WQF 기준 비점오염저감시설 |
|