ABAQUS (2018). Abaqus Analysis Guide 2018. Dassault Systems Simulia Corp.
Chae, SH, Yoo, Y, Lim, CS, and Choi, SH (2019) Applicability analysis of a continuous welded rail construction method on an open deck steel railway bridge using displacement control.
Journal of the Korean Society for Railway, Vol. 22, No. 2, pp. 158-168 (in Korean).
Choi, SH (2019) Technology of CWR for an open deck steel railway bridge. Magazine of the Korean Society of Civil Engineers, Vol. 67, No. 5, pp. 68-73 (in Korean).
Han, SY, Park, NH, Lim, NH, and Kang, YJ (2006) Sensitivity of the continuous welded rail and the fastener on the track stability. Journal of the Korean Society of Civil Engineers, Vol. 26, No. 4A, pp. 719-726 (in Korean).
Hwang, MH, Bae, Y, Kang, K-D, and Kwon, S-J (2017). Comparative study of CWR method of existing plate girder bridges. Proceedings of 2017 Spring Conference. Korean Society for Railway; pp. 304-309 (in Korean).
Korea Rail Network Authority (KR) (2016). Line maintenance guidelines.
KR C-14050 (2016). Continuous welded rail. Railway Design Guidelines and Handbook, Korea Rail Network Authority.
KR C-08080 (2017). Analysis of longitudinal track-bridge interaction. Railway Design Guidelines and Handbook, Korea Rail Network Authority.
KRS TR 0007-15(R) (2006). Wooden sleeper. Korean Railway Standards.
KRS TR 0014-15(R) (2009). Rail fastening system. Korean Railway Standards.
Lee, D-Y, Cho, H-C, and Jun, Y-J (2017) A study on the continuous welded rail on plate girder. Yooshin Technical Bulletin, Vol. 24, pp. 37-48 (in Korean).
Lee, HD, Lee, JH, Song, JK, and Moon, JH (2018) Development of buckling analysis model for CWR on ballastless plate girder bridge and evaluation of minimum resistance for a bridge-sleeper fastener.
Journal of the Korean Society for Railway, Vol. 21, No. 10, pp. 993-1002 (in Korean).
Lee, HD, Lee, JH, Song, JK, and Moon, JH (2019) Theoretical evaluation of section properites of ballastless plate girder bridge’s superstructure. Journal of Korean Society for Urban Railway, Vol. 7, No. 3, pp. 361-371 (in Korean).
UIC 720-R (2005). Laying and maintenance of CWR track. Paris, France.