Cheong, TS, and Jang, KJ (2015).
Enhancement of prior assessment system for disaster risk reduction. Report No. NDMI-RP-2015-03-02-02. National Disaster Management Research Institute, p 57-63.
Cho, MO, Yoon, JY, Jang, SH, and Yoon, YN (2007) An analysis of flood runoff variations due to watershed development using SWMM.
Journal of the Korean Society of Civil Engineers, Vol. 27, No. 2B, pp. 125-132.
Choi, JK, and Park, JH (2015).
Practical strategies for the improvement of environmental impact assessment follow-up. Business Report 2015-04-01. Korea Environment Institute, p 10-15.
Choi, SG, Kim, TH, and Song, YI (2011).
Institutional discussions concerning agreements on effective implementation of environmental impact assessment (EIA). KEI Working Paper 2011-08. Korea Environment Institute, p 5-27.
Han, KH (2004) Legislative improvement of preliminary prevention of disaster: Focusing on the countermeasures against natural disasters act.
Public Law Journal, Vol. 5, No. 2, pp. 575-598.
Jung, DJ, Kim, YT, and Oh, KH (2016) Necessity of disaster impact assessment through analysis of flood control effectiveness on basins.
J Korean Soc Hazard Mitig, Vol. 16, No. 1, pp. 159-168.
Kang, SJ, Jung, JC, and Lee, DB (2014) Improvement of preliminary disaster inspection and consultation system.
J Korean Soc Hazard Mitig, Vol. 14, No. 5, pp. 395-406.
Lee, JM, Jin, KN, Kim, YJ, and Yun, JR (2010).
A study on the establishment of reasonable guidelines for prior review system on the influence of disasters. Land and Housing Institute, p 68-245.
Lee, MJ, Seo, KM, and Choi, WJ (2018) Suggestion on how to improve the pre-disaster impact system: As a comparison of environmental impact assessment system.
J Korean Soc Hazard Mitig, Vol. 18, No. 3, pp. 107-115.
Ministry of Environment (ME) (2000).
Study on for rational follow-up management of environmental impact assessment. p 29-36.
Ministry of Environment (ME) (2013).
Manual for managing comment register report on environmental impact assessment. p 1-35.
Ministry of the Interior and Safety (MOIS) (2015~2019).
Result of implementation status inspection about prior assessment project site for disaster risk reduction.
Ministry of the Interior and Safety (MOIS) (2019).
Guide for disaster impact assessment consultation.
National Law Information Center (2019).
Countermeasures Against Natural Disaster Act.
Park, BH (2011). Current situation and improvement way of the preventive disaster system through predisaster effect examination system.
Mater’s thesis. Hanbat University.
Rho, HJ, and Nam, J (2012) An empirical analysis on the characteristics of disaster mitigation elements by urban development types: Focused on the review of Seoul predisaster effect review committee.
Journal of Korea Planning Association, Vol. 47, No. 4, pp. 105-125.
The Board of Audit and Inspection of Korea (BAI) (2010).
Inspection result report: Disaster management and disaster preparedness. p 47-57.
The Board of Audit and Inspection of Korea (BAI) (2013).
Inspection result report: Prevention of urban flood inundation and restoration work. p 93-95.
The Board of Audit and Inspection of Korea (BAI) (2015).
Inspection result report: General railway construction. p 108-110.