Journal of the Korean Society of Hazard Mitigation 2010;10(1):1-8.
Published online February 28, 2010.
선설계기법을 이용한 장경간 유리온실 구조시스템 개발
오명호, 김용석
The Development of Structural System of Long-span Greenhouse Using the Pre-Engineering Building System
Myoung-Ho Oh, Yong-Seok Kim
Abstract
Rural facilities need to be changed to be industrialized and long span structures due to accelerating aging of the rural population. In this study, the optimized structure was developed by applying Pre-Engineered Building System using the tapered member to make that the Korea standard green house has a long span. When considering design load, reasonable values were adapted by reviewing existing design codes. As a result, applying pre-engineered building system was efficient in structural system that has span longer than 16 m. And it was concluded that the increase with the longitudinal span from 4 m to 12 m was more efficient in aspect of steel amount.
Key Words: Venlo glass greenhouse; Pre-engineering building system; Tapered beam; Optimum structural system
요지
최근 급속도로 가속화되는 농촌인구의 고령화 등으로 인해 농촌시설물도 기업화, 대형화, 대공간 시설물로 변경되어야 할 필요성이 있다. 이 논문에서는 현행 한국형유리온실의 대표적인 시스템인 벤로형 유리온실을 장경간화하기 위해 변단면 부재를 이용한 선설계기법을 적용하여 최적의 구조시스템을 개발하였다. 설계하중은 기존의 설계기준들을 검토하여 합리적인 값들을 적용하였다. 그 결과 스팬이 16 m 이상인 구조시스템에서 선설계기법을 적용하면 효율적이었으며 종방향 간격도 기존의 4 m 보다는 12 m로 증가시키는 것이 철골물량측면에서 유리함을 알 수 있었다.
핵심용어: 벤로형 유리온실; 선설계기법; 변단면부재; 최적구조시스템


ABOUT
ARTICLE CATEGORY

Browse all articles >

BROWSE ARTICLES
AUTHOR INFORMATION
Editorial Office
1010 New Bldg., The Korea Science Technology Center, 22 Teheran-ro 7-gil(635-4 Yeoksam-dong), Gangnam-gu, Seoul 06130, Korea
Tel: +82-2-567-6311    Fax: +82-2-567-6313    E-mail: master@kosham.or.kr                

Copyright © 2024 by The Korean Society of Hazard Mitigation.

Developed in M2PI

Close layer
prev next