1. ABAQUS (2013). Abaqus/standard user's manual –version 6.13. ABAQUS, Inc.
2. Chae, S.H, Yoo, Y, Lim, C.S, and Choi, S.H (2019) Applicability analysis of a continuous welded rail construction method on an open deck steel railway bridge using displacement control.
Journal of Korean Society for Railway, Vol. 22, No. 2, pp. 158-168.
3. European Rail Research Institute (ERRI) (1997) Measurements of lateral resistance, longitudinal resistance and change of neutrak rail temperature (NRT) for ballast track, pp. 2.
4. Han, S.Y, Park, N.H, Lim, N.H, and Kang, Y.J (2006) Sensitivity of the continuous welded rail and the fastener on the track stability. Journal of The Korean Society of Civil Engineers A, Vol. 26, No. 4A, pp. 719-726.
5. Hwang, M.H, Bae, Y.M, Kang, K.D, and Kwon, S.J (2017) Comparative study of CWR method of existing plate girder bridges. Journal of Spring Conference of Korean Society for Railway, pp. 304-309.
6. KR C-08080 (2017) Track-bridge longitudinal interaction analysis. KR.
7. KRS 9103 (2012). Screw spikes for rail. Korea Standard (KS).
8. KRS TR 0007-15R (2006). Wooden sleeper. Korean Railway Standard (KRS).
9. Lim, N.H (2001). Three dimensional nonlinear analysis of continuous welded rail tracks. Ph.D. dissertation, Korea University.
10. Park, J.C, and Lim, N.H (2021) Effect of increasing lateral resistance of ballastless bridge sliding track panel system by installation of reinforcement plate.
Journal of the Korean Society of Hazard Mitigation, Vol. 21, No. 5, pp. 1-5.
11. Park, J.C, Lee, Y.S, Ryou, G.H, and Lim, N.H (2018) Installation of CWR on long span bridges of ballastless tracks.
Journal of the Korean Society of Hazard Mitigation, Vol. 18, No. 7, pp. 47-52.