1. ABAQUS (2021).
Abaqus analysis guide 2021. Dassault Systems Simulia Corp.
2. Choi, B.H (2020).
Development of innovative technology for prefab steel bridges to promote assembly construction and automation. Report No. SPR412-20, Hanbat National University, Daejeon, Korea.
4. Graybeal, B (2012).
Ultra-high performance concrete composite connections for precast concrete bridge decks. Report No. FHWA-HRT-12-041, FHWA, Washinton, DC, USA.
5. Graybeal, B (2014a).
Design and construction of field-cast UHPC connections. Report No. FHWA-HRT-14-084, FHWA, Washinton, DC, USA.
6. Graybeal, B (2014b) Ultra-high performance concrete connections for precast concrete bridge decks.
PCI Journal, Vol. 59, No. 4, pp. 48-62.
7. Im, C.H, Park, G.M, Kang, H.E, Choi, B.H, Park, S.J, and Tae, G.C (2020) Construction of full-depth precast deck for the bridge construction crossing gyeongbu high-speed rail line.
Magazine of the Korea Concrete Institute, Vol. 32, No. 1, pp. 63-68.
8. Jang, J.Y, Chen, H, Lee, C.S, and Kim, T.W (2019) Research trends in off-site consturction management:Review of literature at the operation level.
Korea Journal of Consturction Engineering and Management, Vol. 20, No. 4, pp. 114-125.
9. Kim, D.W, and Shim, C.S (2015) Crack width control on concrete slab using half-depth precast panels with loop joints.
Korean Journal of Agricultural Science, Vol. 35, No. 1, pp. 19-29.
10. Kim, I.G, Kim, Y.J, Kim, S.W, and Jang, S.K (2007) Rapid and mechanized construction of bridge deck with precast concrete deck system used longitudinal tendon.
Magazine of the Korea Concrete Institute, Vol. 19, No. 3, pp. 50-54.
11. Korea Expressway Corporation Research Institute (KECRI) (2018)
Guidelines for design, construction and maintenance of full depth precast deck panels. Report No. 2019-02-536.8, Hwaseong-si, Gyeonggi-do, Korea.
12. Lee, Y.H, Lee, D.H, and Kim, K.T (2012) Considerations in the early stage of designing the unit modular building.
Korea Journal of Consturction Engineering and Management, Vol. 13, No. 6, pp. 133-142.
13. Ministry of Land, Infrastructure and Transport (MOLIT) (2016)
Highway bridge design standard (limit state design), Korea.
14. Min of Land Infrastructure and Transport (MOLIT) (2021)
Concrete Structure Design Details of Reinforecment (KDS 14 20 50).
15. Shin, D.H, Park, S.J, Kim, I.G, and Lee, S.H (2007) Application of precast concrete bridge deck in real structure.
Magazine of the Korea Concrete Institute, Vol. 29, No. 3, pp. 57-60.