![]() |
|
A Study on Determining Repair and Reinforcement Priority for the Each Component Using In-depth Inspection Results on Existing Dams
Jiyeon Park, Ji-Hye Kwon, Tae Hyung Kim
J. Korean Soc. Hazard Mitig. 2016;16(5):199-208. Published online 2016 Oct 31 DOI: https://doi.org/10.9798/KOSHAM.2016.16.5.199
|
|
Citations to this article as recorded by
Surrogate-based multi-objective nose shape optimization for 400 km/h-class high-speed trains under open-air, crosswind, and tunnel operations
Beomsu Kim, Hyeokbin Kwon, Junsun Ahn
Railway Engineering Science.2026;[Epub] CrossRef Study on the Applicability of the Exterior Condition Assessment to Evaluate The Physical Vulnerability of Check Dams
Kihwan Lee, Choongsik Woo
Journal of the Korean Society of Hazard Mitigation.2021; 21(6): 71. CrossRef
|