An Improvement of Investment Priority for Prevention Measures against Storm and Flood Damage
Sub Roh
J. Korean Soc. Hazard Mitig. 2016;16(2):407-412.   Published online 2016 Apr 30     DOI: https://doi.org/10.9798/KOSHAM.2016.16.2.407
Citations to this article as recorded by Crossref logo
Determining Maintenance Project Priority Based on Disaster Risk Assessment: Case of TOPSIS Applications
Woo-Hyun Baek, Eun-Sung Chung, Jae-Soon Choi, Jae-Kwang Ahn
Journal of the Korean Society of Hazard Mitigation.2022; 22(6): 255.     CrossRef
A Comparative Analysis of Local Comprehensive Plans for Storm and Flood Damage Reduction: Focused on Reduction Measures according to Natural Hazard Vulnerability
Dalbyul Lee
Journal of the Korean Society of Hazard Mitigation.2019; 19(7): 409.     CrossRef
A Study on Determination of Investment Priority of Flood Control Considering Flood Vulnerability
Hongjun Joo, Soojun Kim, Myungjin Lee, Hungsoo Kim
Journal of the Korean Society of Hazard Mitigation.2018; 18(2): 417.     CrossRef