Choi, DS, Yoon, KH, and Shin, JD (2014) A study on law analysis for efficient critical infrastructure protection.
J Korean Soc Hazard Mitig, Vol. 14, No. 1, pp. 233-245 (in Korean).
Combelles, J, Goubet, A, Llopis, N, and Paccard, M (1985). Mesures destinées à améliorer la sécurité des ouvrages hydrauliques des barrages. Transactions of the 15th International Congress on Large Dams. Lausanne, Switzerland: C15-Q59-R46.
Department for Environment Food and Rural Affairs (DEFRA) (2006). Engineering guide to emergency planning for UK reservoirs.
Volume 1 of 3: Main guide, Draft for informal consultation.
Environment Agency (2017). Guide to drawdown capacity for reservoir safety and emergency planning.
SC130001, Volume 1: Main guide. Bristol, UK.
Hinks, J (2009) Low level outlets 1: Formula for target capacity.
Dams and Reservoirs, Vol. 19, No. 1, pp. 7-10.
Institution of Civil Engineers (ICE) (2015).
Floods and reservoir safety. 4th ed. London, UK: ICE Publishing.
International Commission on Large Dams (ICOLD) (2013)
Internal erosion of existing dams, levees and dikes, and their foundations, ICOLD Bulletin 164.
IS 15472 (2004).
Guidelines for planning and design of low level outlets for evacuating storage reservoirs. Bureau of Indian Standards..
Johnson, C, Stephens, D, Arnold, M, and Vitharana, N (2010).
2010 – Emergency release capacity for dams – International to local perspectives. Australian National Committee on Large Dams Incorporated (ANCOLD)..
K-water (2013).
A study on emergency outlet works scale determination benchmark for the dam. Korea water resources cooperation, (in Korean).
Nam, KH (2017) The risk management policy suggestions for effective compound disaster management.
J Korean Soc Hazard Mitig, Vol. 17, No. 4, pp. 105-112 (in Korean).
Northern Ireland Water (2014). Booklets given to delegates during tours to the following reservoirs. carried out as part of the 18th Biennial British Dam Society (BDS) Conference. Belfast: (a) Copeland Reservoir, (b) Middle South Woodburn Reservoir, (c) Upper South Woodburn Reservoir..
Philpott, B, Oyeyemi, Y, and Sawyer, J (2008). Queen Mary and King George V emergency draw down schemes. Proceedings of the 15th Biennial BDS Conference. Warwick: pp. 379-391. 10.1680/ersitf.35225.0032.
Son, KI, and Yi, JE (2015) Hydraulic & hydrologic design criteria for an emergency discharge of reservoir (I).
Journal of Korea Water Resources Association, Vol. 48, No. 3, pp. 149-158 (in Korean).
Song, CY, and Kim, DH (2018) Improvement proposals for the guidelines for the national infrastructure protection plan.
J Korean Soc Hazard Mitig, Vol. 18, No. 5, pp. 193-201 (in Korean).
US Army Corps of Engineers (USACE) (1975)
Low level discharge facilities for drawdown of impoundments, Engineer Regulation 1110-2-50.
U.S. Army Corps of Engineers (USACE) (2016)
Design criteria for dam and lake projects, 33 CFR 220.1d, Code of Federal Regulations, Title 33 (7-1-16 Edition). Vol. Chapter 2, No. Part 220.
United States Bureau of Reclamation (USBR) (1990).
Criteria and guidelines for evacuating storage reservoirs and sizing low level outlet works. ACER Technical Memo No. 3. Assistant Commissioner - Engineering and Research..
Yi, JE, Son, KI, and Kang, MS (2013) Hydraulic & hydrologic design criteria for an emergency drainage of reservoir (II).
Journal of Korea Water Resources Association, Vol. 48, No. 3, pp. 159-167 (in Korean).