Anagnostopoulos, J.S, and Papantonis, D.E (2007) Optimal Sizing of a Run-of-river Small Hydropower Plant.
Energy Conversiton and Management, Vol. 48, No. 10, pp. 2663-2670. 10.1016/j.enconman.2007.04.016.
Cho, E.J (2006).
A study on Economical Evaluation of Small Hydro Power System in the Sinchun-sewage Treatment Plant. Master's thesis. Kyungpook National University.
Heo, J.H (2010).
Estimation of Small Hydropower Resources and Development of Geographic Information System. Master's thesis. Kongju National University.
Kim, D.S, and Hong, W.H (2005) Study on Feasibility Analysis for Small Hydro Power Plants in The Sewage Treatment Plants.
Journal of the Architectural Institute of Korea Planning & Design, Vol. 21, No. 5, pp. 223-230.
Kim, K.H (2008).
Framework of Feasibility Study for Small Hydropower Development. Master's thesis, Inha University.
Kim, K.H, Yi, C.S, Lee, J.H, and Shim, M.P (2007) Framework for Optimum Scale Determination for Small Hydropower Development Using Economic Analysis.
Journal of Korea Water Resources Association, Vol. 40, No. 12, pp. 995-1005. 10.3741/JKWRA.2007.40.12.995.
Korea Institute of Energy Research (2013)
Hydrologic Analysis and Resources Assessment for Mapping Small Hydropower Resource.
Lee, G.B (2005) Overview and Trend of Small Hydropower Development in Korea.
Journal of Fluid Machinery, Vol. 8, No. 6, pp. 55-62.
Lee, J.H (2013)
Optimization Model for the Scale Determine of Integrated System in Movable Weir and Small Hydro-power Generation. Ph.D. dissertation, Konkuk University.
Martin, Q.W (1987) Optimal Daily Operation of Surface Water System.
Journal of Water Resource Planning and Management, Vol. 113, No. 4, pp. 453-470. 10.1061/(ASCE)0733-9496(1987)113:4(453).
Ministry of Land Transport and Maritime Affairs (2011).
Water Vision 2020.
Moon, I.S (2005).
Micro Hydropower Generation by Discharge Water of Dongbu Sewage Treatment Plant in Seogwipo City. Master's thesis. Cheju National University.
Na, D.H (2010).
Feasibility study on the Construction of Small Hydro-Power Plants at the Discharge Point of Gumi Sewage Treatment. Ph.D. dissertation. Kumoh National Institute of Technology.
Park, W.S, and Lee, C.H (2010) Hydrologic Performance Characteristics Variation of Small Scale Hydro Power Plant with Variation of Inflow.
Journal of Korea Water Resources Association, Vol. 43, No. 4, pp. 393-398. 10.3741/JKWRA.2010.43.4.393.
Park, W.S, and Lee, C.H (2012) Analysis of Small Hydropower Resources Characteristics for Nakdong River System.
Journal of the Korean Solar Energy Society, Vol. 32, No. 6, pp. 68-75. 10.7836/kses.2012.32.6.068.
Yi, C.S, Kim, K.H, Lee, J.H, and Shim, M.P (2007) Location Analysis for Developing Small Hydropower Using Geo-Spatial Information System.
Journal of Korea Water Resources Association, Vol. 40, No. 12, pp. 985-994. 10.3741/JKWRA.2007.40.12.985.