Study on Optimum Priority of Flood Control Projects Using the Maximized Economic Curve
Hongjun Joo, Taewoo Lee, Jeongwook Kim, Deockhwan Kim, Soojun Kim, Hung Soo Kim
J. Korean Soc. Hazard Mitig. 2018;18(7):403-415.   Published online 2018 Dec 31     DOI: https://doi.org/10.9798/KOSHAM.2018.18.7.403
Citations to this article as recorded by Crossref logo
Estimation of the Optimal Storage Capacity of Rainwater Harvesting System Considering Regional Climate Characteristics
Dong Jun Kim, Jung Ho Lee, Ha Yong Kim
Journal of the Korean Society of Hazard Mitigation.2023; 23(5): 155.     CrossRef
Determination of Investment Priority for Flood Control Using Flood Risk and Economic Assessments
Hongjun Joo, Taewoo Lee, Younghoon You, Wonjoon Wang, Soojun Kim, Hung Soo Kim
Journal of the Korean Society of Hazard Mitigation.2019; 19(6): 291.     CrossRef